Welcome来到IC商城,专业的IC电子元器件采购网上商城
Warm prompt:The pictures are for reference only, and the actual product shall prevail

电源到板 Male SMT 50 CONTACTS

G125-MS15005M2P
电源到板,G125-MS15005M2P
tieredpricing: total: 0
产品二维码 产品二维码
tieredpricing:
  • 1+
quantity:
inventory: 568 PCS
  • wechat:
    微信咨询

    WeChat Scanning Consultation

  • qq: 点击这里给我发消息
  • phone: 13760129277
  • time: Monday to Friday09:00-18:00
Model Recommendation

MB85RS1MTPNF-G-JNERE1

manufacturer: Fujitsu Semiconductor

package:

¥49.470

ADRF5142BCCZN

manufacturer: Analog Devices

package:

¥791.150

S76HS512TC0BHB013

manufacturer: Infineon Technologies

package:

¥162.800

LFD2NX-VERSA-EVN

manufacturer: Lattice

package:

¥2237.400

product name: 电源到板 Male SMT 50 CONTACTS
brand:Harwin package : package:
mpq: 1 inventory channels: moq: 1
G125-MS15005M2P product desc:own
电源到板 Male SMT 50 CONTACTS
product attributes
other message
none
data pdf
G125-MS15005M2P data pdf

FAQs

  • Why do I need a 6 Star energy rating?

    In most Australian states the government requires that all new homes and apartments (along with certain types of building extensions) built since 2010 be energy rated and achieve a minimum of 6 Stars.

  • What information do I need to supply for an energy rating to be completed?

    The information required to complete a full and comprehensive energy report are the following final working drawings: Site Plan, Floor Plan, Elevations, Sections, Lighting layout and window schedule (including sizes of the existing windows).

  • Does building an extension need an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.

  • What is the general cost of an energy rating?

    Depended on the size of the extension you are building there is a chance that it too will need to be energy rated. It's always best to check first before going ahead with construction.